Close
Next Up: Stormwater Utilities Can Incentivize Green Infrastructure
Have Feedback or Comments? Get in Touch!
Close
Lead-free water for all: Making the case for rapid lead pipe removal across the U.S.
#Lead
Source: The Rockafeller Foundation

This report from The Rockefeller Foundation includes six steps to scaling up equitable lead pipe replacement. It includes a case study of Newark’s lead service line replacement program and Trenton’s use of predictive modeling technology. The report mentions Jersey Water Works as a resource on page 39.
Topic:
Lead
